Industrial Case Studies

Real requirements, real negotiations, real outcomes. Eight engagements across three years and five markets, from a first tour to a deal we advised our client to walk away from. Filter by the kind of work, then open any one for the situation, what Drive did, and what it was worth.

Lease Administration

January 2026

The Deal That Didn’t Happen

An acquisition in Florida where the lease did not match the paperwork around it. Our client walked, and that was the right outcome.

The Situation

Our client was in due diligence on an acquisition in Florida and needed a real read on the real estate underneath it: what the existing lease actually committed them to, and what the market around that building looked like.

What Drive Did

We reviewed the lease against the rest of the deal documents and pulled the market data around the building. Several terms in the lease were not accurately reflected elsewhere in the paperwork. We put that in front of our client alongside a broad view of the market the business was operating in.

The Outcome

Our client killed the deal. That is sometimes the right answer, and the work is the same either way: understand what you are committing to before you sign it, particularly when someone else’s paperwork says something different. Growing efficiently means knowing which deals not to do.

Talk to Drive  →
Tenant Representation

October 2025

The Square Footage That Wasn’t There

A Chicago renewal negotiated well below the landlord’s opening number, and then the site plans showed the building was smaller than the lease said.

The Situation

Our client was taking over the operations of a manufacturer in a Chicago building and needed to re-sign the space. The landlord came back with a renewal proposal, and with the operation already running in the building there was no obvious leverage to push against it.

What Drive Did

We took the requirement to market and worked a short list of alternative buildings, which changed the conversation with the landlord. The renewal came down roughly twenty percent from the landlord’s original proposal.

Then we went through the survey and the site plans. The building measured about seventeen percent smaller than the square footage written into the lease. A rail line ran through the middle of it, and that footprint was not usable space, but our client had been paying rent on it.

The Outcome

A renewal well below where the landlord opened, on a square footage figure that finally matched the building. Drive measures every building we tour, clear height included. This is the deal that shows why.

Talk to Drive  →
Logistics Ecosystem

September 2025

Chosen Before Price Came Up

A data center build in Montreal needed heavy cable moved from port to site. We made one introduction and took no fee from either side.

The Situation

We met a group at RE+ that needed project logistics support in Montreal: heavy cabling for a data center operation, moving from the port to the site.

What Drive Did

We made one introduction, at no fee to either side. The operator we brought in had a facility at the port, ran their own drayage rather than brokering it out, carried the specialized equipment to handle heavy cable, and could coordinate the line hauls to the site on their own assets.

The Outcome

The group’s engineer had already toured every facility the market had to offer. Ours was simply one more option on the list. They selected it before pricing was ever discussed.

Talk to Drive  →
Lease Restructuring

August 2025

Out From Under a COVID Lease

A port market lease signed at the peak, unwound into a buyout payment and a building back in the client’s hands.

The Situation

Our client was carrying a COVID era lease in the LA port market at roughly double the going rate. The building had been signed when port congestion had rents at their peak, and by the time the market corrected there were about twenty four months left on the term at a number the business could no longer justify.

What Drive Did

We took the space to market as a sublease and placed it with the tenant next door, who took the building as is at roughly a fifty percent premium over market. That covered the bulk of what our client still owed, with no operational change on their end.

About seven months in, the subtenant decided to leave California altogether and put the space back up for sublease. Rather than let the sublease unwind and hand the problem back to our client, we negotiated a buyout of the obligation they had committed to.

The Outcome

The subtenant bought out of the sublease at close to seventy cents on the dollar against the twelve months still remaining. Our client took the payment, got the building back, and had a contract already out for bid that could backfill the space.

Talk to Drive  →
Site Selection

July 2024

Built for Eight Months. Ran for Twenty Four.

Six hundred thousand square feet of flexible space across two markets, structured so the upside belonged to our client when the project ran long.

The Situation

Our client had a project requirement of roughly six hundred thousand square feet of flexible warehouse space, split across the Phoenix and Detroit markets. The project was scoped at eight months, which is precisely the term the market does not want to write.

What Drive Did

We identified the space in both markets and found subleases well under market. Then we structured the deals around the project instead of the calendar, matching the term to the work and building in protection on the downside if it wrapped early.

The Outcome

The projects ran eighteen months in one market and twenty four in the other, far past the original eight. Because the space was locked in under market with the flexibility already written into the documents, our client cleared better than fifty percent margin on the storage fees alone.

Talk to Drive  →
Site Selection

June 2024

Every Constraint at Once

A foreign automaker importing through the Port of Oakland needed vehicles stored indoors, close to the port, on a dedicated basis, and inside budget.

The Situation

Our client was standing up an operation to support a foreign car manufacturer importing vehicles into the US market through the Port of Oakland. The building had to meet the specifications for handling vehicles, keep them stored indoors, sit close enough to the port to work operationally, and land inside the budget for a dedicated facility. Very little of the market cleared all four.

What Drive Did

We searched against the full constraint set rather than optimizing for any one of them, which is what usually happens when a requirement is this specific. The building came together in San Leandro.

The Outcome

A dedicated facility that met the vehicle specifications, kept the cars indoors, sat within operational reach of the port, and came in on budget. The project has been a considerable success for our client.

Talk to Drive  →
Tenant Representation

December 2023

The Purchase That Became a Better Lease

A Houston consolidation that started out as a building purchase and ended in four hundred fifty thousand square feet of new development at the port.

The Situation

Our client was consolidating facilities in Houston as their port business kept growing, and they needed room for where the business was heading rather than where it had been. The search started as a purchase.

What Drive Did

A brand new development at the port in Seabrook came into view and changed the math. We secured four hundred fifty thousand square feet in that building, negotiating significant free rent and a strong market rate for new construction of that quality.

The Outcome

One facility at the port, sized for growth instead of for today. Our client’s reputation in that market has climbed considerably since, and the move has opened ancillary opportunities for them across North America.

Talk to Drive  →
Site Selection

July 2023

The Market Nobody Showed Them

A national brokerage had two hundred thousand square feet to place in Arizona and no answer. The building was three hours from where everyone was looking.

The Situation

In 2023 our client needed roughly two hundred thousand square feet in Arizona and was working with one of the large national brokerages. Nothing in the market cleared the bar. No building matched the term they were willing to sign at a rent they were willing to pay, and the search had stalled.

What Drive Did

We looked outside the markets everyone was touring and found a building in Kingman, about three hours northwest of Phoenix. We built the relationship with the landlord directly and negotiated from there.

The Outcome

Better rent than anything available in Phoenix, and materially more flexible terms. The flexibility is what mattered: it let our client flex capacity and deliver for their own customer. That same group has brought us two more assignments since.

Talk to Drive  →